For Texas Municipalities, Assisted Living Centers, & other Critical Facilities

$1.8 Billion in Backup Power Funding Coming Soon for Texas Critical Facilities

As information becomes available, we will keep you informed regarding TBPP funding to design and build reliable backup systems that protect your community when the grid fails.

 

Holistic Utility Solutions is not associated with the Texas PUC and can only provide information as it is released from the Texas Energy Fund. 

The Texas Backup Power Package Program

The Texas Backup Power Package Program (TBPPP) is providing up to $1.8B in funding to help communities keep essential services running during grid outages and emergencies. Eligible facilities are expected to include water and wastewater systems, emergency operations centers, assisted living centers, hospitals, and other critical infrastructure.

This funding will support projects that design, build, and install microgrid backup power systems that meet both technical and legislative requirements. Funding will be limited and competitive — municipalities, utilities, and facility owners are encouraged to start tracking information as it is released to be prepared to submit applications when they open.

Secure Your Funding

Understand the application process to put together the right strategy for your facilities.

Design & Build Your System

Partner with a PUC Approved Vendor to design + build the system that meets program requirements.

Protect Your Community

Keep critical services running when it matters most.

What Is the Texas Backup Power Package Program?

The Texas Backup Power Package Program (TBPP) helps ensure that essential community services remain operational during power outages. With up to $500 per kW available, the program helps cover the cost of installing and upgrading emergency backup systems utilizing natural gas or propane generators, battery storage, and solar microgrids.

Funding will be limited and competitive, and applications must demonstrate compliance with state requirements. 

 

Holistic Utility Solutions has helped numerous Texas critical facilities navigate similar projects (non-TBPP funded). While there are no PUC Approved Vendors yet, we are keeping interested potential applicants informed as more information is released in the coming months.

Your Partner in Resilient Infrastructure

Holistic Utility Solutions brings decades of experience in energy, water, and infrastructure management. We’ve helped cities, counties, water utilities, assisted living centers, and healthcare providers strengthen resilience and secure similar funding (non-TBPP) for critical projects. Our typical process includes:

  • Funding application strategy and preparation
  • Backup power system design and sizing
  • Engineering, procurement, and construction (EPC)
  • Commissioning, testing, and compliance documentation
  • Ongoing maintenance and optimization

How to Apply for TBPPP Funding

1

Confirm Eligibility

Determine if your facility qualifies under TBPPP requirements.

2

Estimate System Size (kW)

Calculate your system size based on energy use and program guidelines

3

Prepare Application Package

Once applications open, submit the required information for your facility and project.

4

Design & Build

Start implementing your new backup power system.

Don’t miss your chance to secure funding for your critical facility

Discover How Much Funding Your Facility May Qualify For

Funding will be limited and competitive — reach out to Holistic Utility Solutions today to stay informed as details are released. Complete the form below and we’ll relay information as it is received from the official sources with the Texas Energy Fund.

*Holistic Utility Solutions is not associated with the Texas Public Utility Commission and can only provide information as it is released publicly.

Fill out the contact form, and we'll reply shortly.

Mailing Address

129 S. Main St, Suite 260
Grapevine, TX 76051

Office Address

(By Appointment Only)

412 S. Main St, Suite 200
Grapevine, TX 76051